<noframes id="ixm7d"><noframes id="ixm7d"><rt id="ixm7d"><delect id="ixm7d"></delect></rt><noframes id="ixm7d"><rt id="ixm7d"><rt id="ixm7d"></rt></rt><rt id="ixm7d"></rt> <noframes id="ixm7d"><rt id="ixm7d"><delect id="ixm7d"></delect></rt><delect id="ixm7d"></delect><bdo id="ixm7d"></bdo><rt id="ixm7d"></rt><bdo id="ixm7d"></bdo><noframes id="ixm7d"><rt id="ixm7d"><rt id="ixm7d"></rt></rt><rt id="ixm7d"><rt id="ixm7d"></rt></rt><noframes id="ixm7d"><rt id="ixm7d"></rt><noframes id="ixm7d"><rt id="ixm7d"></rt> <noframes id="ixm7d"><rt id="ixm7d"></rt><noframes id="ixm7d"><noframes id="ixm7d"><noframes id="ixm7d"><rt id="ixm7d"></rt><noframes id="ixm7d"><noframes id="ixm7d"><noframes id="ixm7d"><rt id="ixm7d"></rt><noframes id="ixm7d"><rt id="ixm7d"></rt><noframes id="ixm7d"><rt id="ixm7d"></rt><noframes id="ixm7d">

承包施工合同范文

2023-07-04

承包施工合同范文第1篇

承包方(以下簡稱乙方):模板工程承包班組

甲方承建的模板單項工程,于______年______月______日,由甲方發包給乙方采用包工方式進行施工。為了明確工程內容及雙方責任,本著互相協助及分工負責等原則,根據本工程的情況,特商定如下條款,共同遵守執行:

一、工程內容:按益施工圖紙中基礎分部±0.000以下所有模板工程項目與設計變更單的所有工作內容。

二、承包造價:以模板與砼接觸面積計算工程量,包括所有制、安、拆、運及現場文明施工中的工作內容,并承擔所有預埋鐵件拉墻筋的安裝,每平方米______元(該承包單價已含乙方管理費、各類補貼費用及制安模板所用的鐵絲、鐵釘在內)。

三、組織領導

1)甲、乙雙方必須指定專職管理人員,負責安排施工、生產、人員調動、技術安全、工程質量以及生活、計生等工作。

2)乙方必須確保進場人員的政治素質及身體、技術素質,嚴禁使用童工、女工。特殊工種必須持有上崗證、操作證。經批準進場的工人須持有效證件。進場時,每人交一寸免冠照片三張,并附花名冊一式二份。在合同期內,未經甲方允許,乙方不得隨意更換施工人員,以保證本組技術實力和隊伍的穩定性。

3)乙方應服從甲方的統一指揮、調配、指導及管理,遵守甲方現場的各項管理制度,如質量、安全、進度文明施工制度及宿舍、伙房紀律。

4)合同期內,未經雙方商妥并正式辦理解除合同手續,乙方不得單方撤離施工隊伍,否則,因此而導致施工現場生產停頓、延誤工期等造成的一切經濟損失均由乙方單方負責,同時,甲方有權單方面凍結乙方的承包工程款。

四、雙方責任

1.甲方責任:

1)提供乙方進場人員的生活住宿條件,負責申報臨時戶口

2)負責工地現場的工程質量、安全生產、工程進度、配料用料及各項規章制度的指揮、監督與管理。

3)提供施工必要的機械設備,負責機械的一次性調試運轉(以后由乙方負責),小型工具由乙方自備。

4)保證材料供應(材料運至現場______米內,但不提供塔吊運輸),如確因種種原因供應不足時,甲方應及時安排其它工作,乙方應服從甲方的調配。工地現場計時工每工日______元。

2.乙方責任:

1)嚴格按照施工圖紙與設計變更通知施工,遵守執行國家現行《施工技術驗收規范》。尊重和服從建設、臨理單位及甲方管理人員的監督與指揮,確保工程質量達到優良等級以上。

2)嚴格本班組自身的安全生產教育。每個工人入場時,都必須認真學習、遵守執行經理部制訂的《安全管理暫行規定》(附后)等制度,提高工人的安全生產意識,保證不違反安全操作規程,避免民生安全事故,并承擔凡是違反安全操作規程和安全制度的大小安全事故的責任。

3)提倡文明施工,工完場清并遵守甲方現場的各項文明施工管理制度,搞好與建設、監理單位、甲方及其他班組間的關系。必須要求每一個工人遵守紀律,不打架,不滋惹是非,若違反,乙方要承擔責任。

4)絕對服從甲方的工程進度安排。班組長必須在操作作業現場,未經經理同意不準離開工地。應保證足夠的施工力量,否則,因此而造成的一切后果均由乙方承擔。負責組織工人進退場,其費用由乙方負責。

5)嚴格按照甲方規定的配合比合下料,、不造成人為的浪費。收工前要把剩余的材料清理并盡量回收,做到工完場清,不準從樓層上往下倒建筑垃圾。

6)愛惜甲方的一切機械設備和工具,承擔本組一切機械設備和工具的維護與保管。違章操作致使機械設備和工具損壞的,其維修費用及由此而引起的損失由乙方負責賠償。嚴格履行材物領(借)用手續,工完退回。

7)模板制、安必須保證幾何尺寸準確和牢固,不準出現下垂、脹模、漏漿等現象。每次澆搗砼梁、板、柱的時候,必須派專人跟班,以保證質量。如砼脹模超過允許偏差值,乙方應在拆模后立即負責鑿平。在安裝及拆模后,應及時將板面及樓面的垃圾、材料清理干凈,避免影響下道工序的施工。工程完成后,必須把所有木工用料堆回指定位置。

8)乙方必須嚴格遵守、執行以上各項規定和要求,否則,甲方有權逐項予以罰款處理,所罰款項在結算款中一次扣除,情節嚴重者則予清除離廠。?

五、工程質量及驗收標準

工程質量必須達到國家現行施工及驗收規范以及建設、監理單位和甲方的要求。如果由于設計和管理指揮原因造成損失,所有經濟全部由甲方負責;由于操作者盲目蠻干、圖速度、不按規范規定操作所造成的返工,其返工費用由乙方負責,所造成的材料浪費及經濟損失全部由乙方負責賠償。

六、工期

根據項目經理部現場所安排的月、周施工計劃的時間、期限,保證按期或提前完成所有本項目的施工任務。

七、付款方法

1)為保持施工生產的穩定、連續性,甲方按乙方所完成的施工進度支付給______%的工款,基礎工程完工且驗收通過后,十天內結算并付清所有工款。若乙方中途因不能保證甲方的工期、質量、安全及違反國家有關法規而退場,甲方有權拒付工程承包余款,有權單方面解除合同。

2)結算程序:每月底結算當月______-______日(______日)的工作量,乙方根據主管工長簽證的分項工程驗收單、現場質檢證質量等級、下道工序工長簽字接收,經項目經理審核,報公司預算部結算核定,總經理簽字同意后,財務部在下月十五日左右予以支付。

八、其它

1)由甲方違章指揮或強命工人違章操作造成的傷害,其經濟損失由甲方負責,造成終身致殘的,視程度予以賠償,但最高幅度賠償為一次性______元封頂。

2)由于他人違章作業而造成的傷害,其經濟損失由肇事者負責。甲方負責追查傷者費用暫由甲方支付。

3)凡操作者違反操作規程和工地有關規定所造成的傷害,其一切費用全部由乙方負責。

4)傷者費用在______元以內,不管何種原因均由乙方自理。

九、本合同未盡事宜,雙方另行協商解決。

十、甲方對以上各條款負有解釋權。

十一、本合同一式四份,甲方執三份、乙方執一份,均具有同等效力,并自簽訂之日起生效,至合同期完付清所有承包款時失效。

發包方(甲方):工程公司項目經理部

代表:____________________________

承包方(乙方):模板工程承包班組

承包施工合同范文第2篇

合同名稱 泥工承包合同 合同編號 NTRJ-DY--勞務- 執行日期 年月日 修訂日期 2010.6

泥工勞務承包合同

工程總包單位:(以下簡稱甲方)

工程勞務單位:(以下簡稱乙方)

身份證號碼:住址:

根據《中華人民共和國合同法》和《中華人民共和國建筑法》、《建筑安裝工程施工規范》、《建筑安裝工程質量檢驗評定標準》、《建筑施工安全檢查標準》,本著對工程負責和平等互利的原則,甲乙雙方經過協商一致,簽訂本合同共同遵守。

一、工程名稱:

二、工程地點:

三、承包方式:勞務分包(即包人工、包質量、包安全文明、包工期)

四、承包單價:詳見報價單(附表1)

1)不分施工部位的難易程度均已綜合考慮。

2)本承包單價中,80%為農民工工資,其余20%為機具設備費、輔材費、質量保證費、工期保證費、安全文明保證費、管理費和利潤。

五、承包范圍:

1)建筑結構施工圖、圖紙會審、設計變更、施工聯系單、施工組織設計、施工方案、后澆工程及施工規范所確定的從修土開始至主體澆注、砌筑全部結束的所有土建工程量。

2)因工程施工,管理、檢查及其它原因需要增加且經甲方確認由泥工班組完成的工作。

3)施工中因甲方原因引起的返工,造價在 200 元以內不另計工程款,超過 200元按實際工程量計算。

4)本合同約定的其它應由泥工完成的工作。

六、承包內容:

1)基槽機械挖土后的人工修整、承臺、地梁的開挖、排水、基底夯實、釬探、回土圍護;

2)樁芯澆注,樁頭處理,廢樁頭外運;

3)所有現澆及預制混凝土的制作、澆注、養護(必須派專人養護、每個部位澆水不得小于拾天且養

護水管乙方自理),包含并不僅限 ①前后臺運輸;②操作面的簡易架子搭拆,澆搗范圍內所需的臨時

跑道搭拆、安放溜槽、放料、模內雜物的清理(包括后澆帶、樓梯等鋼絲網的安置)、安放預埋件,

安、拆(移)泵管、墻、柱腳模板座漿,混凝土搗實、抹平、覆蓋及養護;③按設計規定處理好施工

縫、后澆帶、收撿落地混凝土及各樓層混凝土垃圾的清理和運輸至指定地點堆放;砼輸送泵管件、管

扣的清洗、清理、收集和保管。④預制構件的制作(包括木工、鋼筋用的預制墊塊)、安裝;⑤主體

結構采用商品砼,二次結構采用自拌砼,同時乙方做好混凝土試塊。

4)所有磚砌體,包含并不僅限基礎磚胎膜、磚基礎、防水保護墻、內外砌體、零星砌體等砌筑、砂

漿拌制、磚砌體拉結筋的擺放、預留洞封堵、場內材料運輸(包括開卷揚機、攪拌機、砂漿機人工)、

攪拌機械及其他機械用具的清潔養護工作、落地灰再利用及現場清理、打掃、門窗塞縫補爛等。

5)與各工序工種之間的配合協作。

6)配合甲方迎接每次公司、建設單位及政府組織的大檢查。

七、質量標準:優良,按照國家有關規定及驗收標準進行驗收。

1)確保每次隱蔽工程驗收一次性通過,如一次驗收通不過罰款200元/次,整改后再通不過罰款500

元/次,如累計三次發生此類情況,則視為無力承擔此項工作,作清場處理。

2)若甲方通知乙方清場,乙方必須在3日內無條件清場,勞務工資按照80%結賬。

八、安全文明標準:東營市安全文明工地

1)進入施工現場,乙方必須遵守安全文明管理規定,如有違章操作的,甲方將視情節輕重進行罰款。

2)嚴禁工地內有聚眾鬧事、打架、賭博現象。班組內部出現打架現象每次罰款500元,班組與其他

班組打架每次罰款1000元,情節嚴重的交公安部門處理。

3)工傷處理:乙方在施工過程中,由于自身原因造成醫療費用均由乙方負責,與甲方無關;如因甲方

原因造成的均由甲方負責,如雙方共同原因,一次工傷費用在人民幣2萬以內均由乙方自行承擔,一

次工傷費用人民幣2萬元超出部分甲方負責50%,乙方負責50%。乙方任何人員不得酒后上崗,酒后發

生所有事故均與甲方無關,乙方及本人承擔一切費用及責任。

4)乙方需指派一名人員,每月打掃生活區或者施工現場公共區域不少于10天,具體服從甲方安全員的安排。

九、進度指標:

1)乙方進場時間定為20年月日,退場時間為20年月日,施工工期為天(包括雨、雪天及節假日)。

2)標準層施工時間為天,因乙方原因造成未達到甲方的工期要求,每延誤一天罰款500元,如累計三次發生此類情況,則視為無力承擔此項工作,作清場處理。

十、材料管理

1)乙方在簽訂合同后15日內提交材料供應總計劃(誤差不超5%)。

2)乙方各施工階段前15日內提交當期材料供應申請計劃(誤差不超2%),經甲方審核后,安排統一供應;因計劃提交不及時或者誤差較大,導致材料供應不及時,造成其他班組窩工或者工期拖延,相應窩工補償和損失由乙方承擔。

3)乙方領用材料,必須辦理領用手續,若無領用手續,擅自使用甲方任何材料,罰款500元/次;乙方每月領用生活費時,需提交當月材料領用、耗用、結余明細,經倉庫保管、樓號負責人、項目經理確認,交由財務留存;乙方辦理竣工結算時,需與甲方倉庫保管、財務、預算核對全部材料耗用指標,損耗超過1%時,超出部分由乙方承擔。

4)乙方自配工具: 500元以下的小型機具設備;乙方包輔助材料:手套、雨衣、雨鞋、安全帽、安全帶、手套、等勞動保護用品均由乙方自理,但安全帽的樣式、規格、顏色統

一、且顏色質量由甲方指定。

5)甲方提供乙方住房并安裝電表,乙方按甲方指定房間入住,每間住房人數由甲方確定。住宿人員名單按規定張帖并報甲方備案。每間寢室甲方每月提供乙方用電30度,超用部分電價按實收費。甲方寢室內所有設施有各勞務負責人簽收,如門、窗及玻璃、墻板、退場時驗收歸還,損壞照價賠償,惡意破壞的處以罰款。

十一、工程進度款及結算方式

1)付款方式:

① 乙方人員在進場當月生活費自理,甲方不提供任何借支;

② 乙方實際出勤在25天以上的人員,每人每月發放800元生活費,乙方每月在15日之前上報出勤人數和工人生活費發放明細表,甲方審核后于16日發放給乙方,并將發放明細表張榜公示;乙方材料費和管理費每月按完成工程產值的5%支付;當月罰款作為預支,由乙方確認計入乙方已付款中。 ③ 跨工程在年終結算時,按實際工程量付至90%工程承包款;春節后,在承包項目主體結束,人員退場后付至80%;主體工程驗收合格付至90%,待工程竣工驗收合格后付至結算值的95%。 ④ 余結算造價的5%作為保修金,在工程竣工期滿一年后30日內無息支付。

2)結算方式:

① 主樓部分(含地下部分)建筑面積按照現行的建筑面積計算規則計算(外保溫部分不含在內),地下室部分按照實際工程量結算;

② 承包單價中包含與泥工工程相關的一切可預見及不可預見的零工,如項目部管理人員作出點工簽單均視作無效簽單,不予計費;

③在施工中因乙方經濟實力或施工人員調配不足,影響工程的質量及進度,甲方有權隨時給予清退,乙方在接到通知后必須2日內全部清退完畢,不得影響后續施工隊的工作,否則承擔由此產生的一切后果,并自愿將完成工程量按照80%結算。

十二、甲方的權利和責任

1)項目經理、項目工程師和施工管理人員,對工程質量,安全,文明施工及施工進度進行監督、驗收、解決應由甲方處理的有關事宜。

2)對乙方進行施工圖、施工組織設計、質量要求、施工規范和操作規程的交底,負責施工主軸線的定位放線。

3)編排工程進度計劃,提供技術、材料、機械、安全設施等方面的施工保證。

4)向乙方提供所需的施工圖紙及有關資料一套(施工時不足部分由乙方自理)。

5)向乙方提供宿舍、用水、用電。

十三、乙方的權利和責任

1)指派一名負責人,一名質安員上班,每天參加項目部班前會,項目部給予考勤,考勤不到每天以曠工處理扣200元/人,在當月工程

進度款中扣除。準時參加甲方和監理召開的各種會議,不參加或遲到者處罰100元/次或50元/次。 乙方負責人應隨時保持與甲方的聯系,禁止關掉手機,保證隨叫隨到,否則每次罰款300元。乙方需自行配備信號工。

2)乙方人員應在進場后三天內帶齊各種有關證件及一寸彩色照片2張,并將各種證復印件,按花名冊順序排列,交項目部登記備案,辦理工作卡,每張10元,退場時退場還5元,甲方統一辦理。乙方必須與施工作業人員簽定用工協議,副本由工地辦公室存檔。

3)熟悉圖紙,嚴格按照施工圖紙、施工組織設計、施工規范和操作規程施工,負責本工程施工段放線定位工作,并確定準確。

4)服從甲方現場管理人員領導和指揮,接受甲方、業主、監理部門檢查監督。遵守甲方各項規章制度的管理,否則按規定處罰,罰金在當月進度款中扣除。

5)乙方應無條件服從甲方所排施工進度計劃,并且在規定時間內完成,如在規定時間內未安排人員或未完成,甲方可自行安排其它人員進場施工,所花費的一切費用,在乙方當月進度款中扣除。

6)乙方對本班組的安全生產負責,進入現場嚴格遵守甲方的安全管理制度。由于乙方未能按照安全操作規程進行施工而造成的事故和損失,一切費用由乙方承擔。

7)乙方應執行甲方關于文明施工有關規定,做到誰施工誰清理,隨做隨清,工完場清,材料堆放整齊。如乙方拒不清理,甲方指派第三方清理,按照100元/工從乙方結算值中扣減,無需經過乙方確認。 十

四、履約保證

乙方承諾確保甲方的工程進度、工程質量、安全施工和文明衛生,自覺遵守國家的法律法規和甲方的有關制度,愿交履約保證金包的工程全部完成,甲方及監理驗收合格,由甲方主要負責人審核同意后全部退還。如乙方未能履行合同,保證金則抵作違約金來補償甲方因乙方原因造成的損失。

十五、其它

1)其它未盡事宜,雙方協商解決,并簽訂補充協議。

2)本合同雙方簽字,收到足額的履約保證金后生效,工程完工后自動失效。

3)本合同一式三份,甲方持二份,乙方一份。

4)附表:報價表

甲方:乙方:

項目負責人:項目負責人:

承包施工合同范文第3篇

1.本合同簽訂后__日內,發包方支付不少于合同總價的(或當年投資額的)

__%的預付款,計人民幣____萬元。

2.發包方收到承包方的工程進度月報后,必須在__日內按核實的工程進度支付工程進度款,工程進度款支付達到總合同總價的__%時,逐步按比例開始扣回預付款(或抵作工程進度款)。

3.工程進度款支付達到合同總價款的__%時,不再按進度付款。辦完交工驗收后_

4.如發包方拖欠工程進度款或尾款,應按銀行有關逾期付款辦法或“工程價款結算辦法”的有關規定處理。

5.確因發包方拖欠工程款、代購材料差款而影響工程進度、造成承包方的停、窩工損失的,應由發包方承擔。

6.本工程造價結算方式按下列情況辦理:

(1)以審查后的施工圖預算加變更簽證進行結算;

(2)按施工圖預算加包干系數確定的包干造價結算,包干范圍以外的費用,按___等有關規定結算;

(3)按標準施工圖單位造價包干結算,包干范圍以外的費用按___等有關規定結算;

(4)包干不包料的工程,按預算定額規定的人工費和機械費及相應的管理費結算;

(5)招標工程按中標價款結算,中標范圍以外的工程費用,另按___等有關規定結算。

7.承包方在單項工程竣工驗收后__天內,將竣工結算文件送交發包方和經辦銀行審查,發包方在接到結算文件__天內審查完畢,如到期未提出異議,即由經辦銀行審定后撥款給承包方。

第九條 違約責任與獎勵規定1.承包方的責任

(1)工程質量不符合合同規定的,負責無償修理或返工。由于修理返工造成逾期交付的,按合同總價的__%償付逾期違約金。

(2)工程交付時間不符合規定,按合同總價的__%償付逾期違約金。

2.發包方的責任

(1)未能按照承包合同的規定履行自己應負的責任,除竣工日期得以順延外,還應賠償承包方因此發生的實際損失。

(2)工程中途停建、緩建或由于設計變更以及設計錯誤造成的停工,應采取措施彌補或減少損失,同時,賠償承包方由此而造成的停工、窩工、返工、倒運、人員和機械設備調遷、材料和構件積壓的實際損失。

(3)工程未經驗收,發包方提前使用或擅自動用,由此而發生的質量或其他問題,由發包方承擔責任。

(4)超過合同規定日期驗收,按合同總價的__%償付逾期違約金。

3.發包方有提前工期要求的,可以實行提前竣工獎,按照合同工期,每提前1天由發包方按合同總價的__%獎給承包方。

優良工程每平方米獎__元。

第十條 爭議的解決方式合同執行過程中如發生爭議,雙方應及時協商解決。協商不成時,如雙方屬于同一部門的,由上級主管部門調解;調解不成,或雙方不屬于同一個部門的,任何一方均可向工商局經濟合同仲裁委員會申請仲裁,也可直接向人民法院起訴。

第十一條 特殊條款本合同條款如對特殊情況有未盡事宜,雙方可根據具體情況結合有關規定議定特殊條款。

第十二條 附則其他本合同未言明事項,一律按《中華人民共和國經濟合同法》和《建筑安裝工程承包合同條例》規定執行。合同附件:

(1)工程項目一覽表(附表一);

(2)全部施工圖紙;

(3)施工圖預算;

(4)發包方負責供應材料、設備一覽表(附表二);

承包施工合同范文第4篇

一、工程概況及承包范圍:

1、工程名稱:××××××1#、2#樓

2、工程地點:××××××

3、建筑面積:按圖紙以定額標準計算面積

4、承包方式:包工不包料

5、承包范圍、內容及義務:

5、

1、混凝土及土方工程范圍:

工作內容:隨挖機配合抄平、配合施工放線、基坑排水、清理淤土、局部坑基清挖,砌排水溝、集水坑,隨時清理溝中泥渣(不包括大量塌方),基坑鋪碎石。(用具自備)

工地所有混凝土(除塔吊基礎)水平垂直運輸、攪拌、搗固、養護、臨時腳手架搭設、平板鋪設,清理落地余渣并加以利用,不得浪費,否則浪費砼5公斤以上,罰款10元以上。泵管堵塞的拆安清理,每次工序完成后機械沖洗干凈。(小型工具,振動泵自備)

5、

2、模板工程范圍:

工作內容:配合放線,甲方放坐標線,乙方按圖紙放分線、抄平、標高線,陽臺飄窗外圍彈垂直控制線,制作安裝拆除整理當班堆放,支撐及臨時腳手架搭拆。釘子、鐵絲、拉桿、套管、步步緊等自帶(除止水拉桿)。模板、木方等材料下車,場內運輸,塔吊掛鉤、工序完拆除后、清理當班雜物,刷隔離劑,清理樓層的模板、木方。工程完后,整模板、木方、取釘子,按指定的位置堆放。(機械、用具自備)

5、

3、鋼筋工程范圍:

工作內容:進場材料下車、場內運輸,放樣、制作、有序堆放綁扎,拉墻筋制安及固劑,焊接、車絲、壓力焊、照看鋼筋、現場清理、完工場凈等。(機械、套筒,用具自備)

5、

4、砌體工程范圍:

工作內容:調運砂漿。運磚、砌磚、過梁安裝、預埋等,砌體放線彈50線。清掃落地灰,歸堆并加以利用處理,否則浪費砂漿5公斤以上,罰款10元以上,樓地面磚渣灰清掃干凈。(斗車、小型用具自備)

6、施工總工期250日歷天,開工日期2013年5月20日,竣工日期 年 月 日。

7、工程質量標準為武漢市優良工程,安全生產為武漢市優良現場、文明施工為武漢市優良工地。

8、合同價格:人民幣(暫定)貳佰叁拾萬。

二、雙方權利和義務:

(一)甲方的權利和義務

1、甲方項目經理: 為本工程施工現場全權代表。

2、全面負責該工程的實施,對工程項目的質量、進度、造價、安全文明進行控制管理及協調各方關系。

3、負責設計圖紙問題的處理,工程變更的簽證,工程進度款的支付,辦理竣工決算等,以上均以書面文字為依據。

4、按照本合同規定,行業規范或從質量、安全文明等方面考慮,對乙方必須采取施工措施而沒有采取措施的,甲方可以委托其他單位施工,并按實際發生的費用的2倍從乙方工程款扣回。

5、如乙方不按合同要求進行組織施工,甲方隨時隨地可勒令乙方停工整改,并由乙方承擔停工損失,待整改完畢經甲方同意方可復工,如整改后仍不符合合同要求,則甲方可解除合同,清退乙方出場,由此造成的一切損失由乙方承擔。

6、乙方施工人員及管理人員,必須無條件服從甲方現場施工、管理負責人。否則甲方現場施工管理員有權作出處罰。罰金從工程當月進度款中扣除。

(二)乙方的權利和義務

1、乙方項目負責人: 為泥、木、鋼分項工程在施工現場全權代表。對承包項目施工過程全面負責,嚴格按承包合同中的過程質量、工期施工,實現安全生產,文明施工,遵守甲方的管理和調配。

2,遵守有關法律和規定,按照甲方的現場監理和施工管理員的指令,依據施工圖紙、設計變更、圖紙會審紀要,例會紀要、施工驗收規范等相關要求進行施工。

3、按武漢市建筑過程文明施工管理辦法、武漢市建筑安全生產監督管理辦法進行文明施工、安全生產。

4、甲方提供的施工圖紙及合同文件等相關資料,未經甲方同意不得轉讓或出借第三方,違者則承擔罰款5千~5萬/次。

5、在施工至竣工交付前,乙方應負責保護工程成品及半成品,如若損壞則按工料價格的1.5倍賠償。

6、承包工程完工后7天內清理完現場,按甲方要求將工程用料整理堆放在指定位置,施工人員除留保修人員外其他人員全部退出現場。

三、質量與工期:

1、乙方認真按照施工圖紙、設計變更、施工規范、驗收標準及強制性標準進行施工和驗收。

2、如乙方承包工程質量達不到合同約定標準,乙方應在甲方規定時間內無條件返工修補,直至達到約定標準,由此造成的一切損失均由乙方承擔。

3乙方應嚴格執行隱蔽工程及中間驗收制度,達到驗收標準,方可進入下一步工序施工。

4、乙方無條件配合除乙方承包項目以外的其他項目施工,如乙方拒絕配合或影響其他項目的施工,則乙方應承擔其造成的相應損失。

5、乙方如出現下列違章違規情況造成損失,則乙方承擔損失所產生費用的140%進行賠償:

(1)承包項目施工質量達不到約定標準,進行返工整改。 (2)不按圖施工,不聽從指揮造成施工錯誤,進行的返工。

(3)不按設計要求,施工規范施工配料,不實行限額配料制度,造成超出定額含量的材料浪費。

(4)對現場的耗材及周轉材料不合理利用,造成的新舊材料浪費。

6、乙方嚴格按規范及技術人員的要求施工,模板工程允許偏差:軸線±3mm,平整度±5mm,按規范起拱,現澆板標高+5mm~+8mm,樓層標高±3mm超出允許偏差范圍每處罰款50元以上;腳模30mm以上,每處罰款200以上。腳模50mm以上,每處罰款500元以上。鋼筋工程允許偏差:長度超長10mm每處罰款5元,板筋、箍筋間距小3mm以上,每處罰款10元以上,鋼筋保護層最小10mm,否則每處罰款50元以上,杜絕現澆板底面有鋼筋印子,否則每處罰款200元以上?,F澆板砼表面有鋼筋樁及露筋,每根罰款50元。柱墻鋼筋偏移線外5mm,每處罰款50元以上,偏移嚴重的按情節每處罰款200元以上,并承擔一切責任。砼工程:砼必須振搗密實,無蜂窩麻面,否則砼麻面每處罰款50元,砼蜂窩每處100元以上,嚴重砼蜂窩麻面每處罰款1000元以上,乙方并承擔一切責任及一切處理費用。砌體工程允許偏差:軸線±3mm,垂直度3mm、平整度3mm,偏差超過5mm,每㎡罰款20元,偏差嚴重的返工并按情節罰款100元以上,灰縫飽滿,有半眼、穿眼每處罰款10元,加氣塊砌墻前一天必須濕水飽滿,發現沒有濕水每塊罰款5元。各分項工程施工完后,必須把樓層清掃干凈,否則每層罰款500元以上。

7、安全文明施工:

7、

1、乙方嚴格按武漢市文明施工、安全生產管理辦法進行安全、文明施工,并隨時接受甲方、監理公司和相關管理部門的檢查人員依法實施的監督檢查。

7、

2、乙方在施工過程中發生的一切操作不當人為安全事故,由此產生的一切責任和費用全部由乙方自行承擔。

7、

3、乙方對員工經常進行安全文明施工的思想教育,對施工要求持證上崗必須由專業人員持證上崗操作,如違規操作造成安全事故后果自負,并處1000~10000元/人/次的罰款。

7、

4、乙方嚴格執行甲方的各項管理規章制度,并禁止乙方員工在宿舍內使用電爐、電飯煲、熱得快及私人自接水電及留宿外來人員。禁止帶未成年人進入施工現場。必須統一在食堂就餐,如違規則處(500~1000)元/人/次的罰款。發現用電爐、電飯煲、熱得快,每個每次罰款200元以上,宿舍照明統一用低壓36伏,允許用電扇,甲方不承擔空調及空調用電的費用,由乙方承擔空調及空調用電的費用,并乙方安電表。

7、

5、乙方進入施工現場不得穿拖鞋、高跟鞋、不得酒后上班、要求戴好安全帽(特殊工程系好安全帶)。如發現違規則處以(100~500)元/人/次的罰款。

7、

6、乙方員工不得聚眾賭博、打架鬧事等違法活動,偷拿公司財務。如違例一次,則處1000~5000元的罰款,情節嚴重者解除合同清退出場。

7、

7、乙方必須做好流動人員計劃生育管理,遵紀守法,如違例一次,處以10000元罰款,并將違法人員清退出場。

8、合同價格計價方式、付款方式、結算方式及保修:

8、

1、合同計價方式及內容:

(1)鋼筋、砼、砌體工程單價80元/㎡。

(2)木工、模板與砼接觸面積(模板展開面積)單價30元/㎡。

(3)地下室筏板砼7元/m³,±0.000m以下梁、板、柱、獨立承臺砼22元/m³。 (4)±0.000m以下鋼筋550元/噸。

8、

2、付款方式:

(1)工人進場施工2個月以后,人工生活費按出勤30~50元/工日借支,每季度支付按部分已完工程量50%,工程竣工支付至85%,余款5%留作保修費,剩余款工程竣工后3月內付清。

(2)合同人工價格風險,乙方自己全部承擔,如中途退場按已完工程50%結算。 (3)合同單價全部采用包干形式,并在合同中詳細注明承包項目的范圍、內容及價格,一律不準對合同單價進行調整,只對設計變更的工程量進行增減。

(4)特殊情況下需簽發計時工時,由甲方技術負責人簽證注明發生計時工的具體事項,計時工150元/工日。

9、其他條款:

9、

1、未經甲方同意,乙方將本合同承包項目轉包或分包給第三方,則甲方有權終止合同,并由乙方承擔合同價款30%的違約金支付給甲方。

9、

2、甲乙雙方在履行合同時如有未盡事宜或發生爭議,可協商解決或向甲方所在地人民法院提起訴訟。

9、

3、本合同一式貳份,甲、乙雙方各持一份,簽字生效。 甲方:

承包施工合同范文第5篇

【安全文明施工專項方案】

貴州省六枝特區示范小城鎮生態環境二期建設工程——(落別鄉外立面改造工程)

安全文明施工專項方案

編 制 人 : 審 核 人 : 批 準 人 :

中國建筑第四工程局有限公司

日 期: 年 月 日

貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

目錄

一、工程概況: ........................................................................................................................................................ 2

二、編制依據 ............................................................................................................................................................ 2

三、安全生產保證措施 ............................................................................................................................................ 3 2.1 建立安全生產組織機構 ............................................................................................................................ 3 2.2 安全管理制度 ............................................................................................................................................ 3 2.3安全管理 ..................................................................................................................................................... 4 2.3.1 安全防護用器具 ............................................................................................................................ 5 2.3.2 施工用電 ........................................................................................................................................ 7 2.3.3中小機械管理 ................................................................................................................................. 5 2.3.4 消防管理 ........................................................................................................................................ 7 2.3.5 冬、雨季施工 ................................................................................................................................ 9 2.3.7.個人防護 ...................................................................................................................................... 10 2.3.8.腳手架安全施工技術措施 .......................................................................................................... 10 2.3.9、腳手架的安全、防風防雷措施 ................................................................................................ 11

四、文明施工管理措施 .......................................................................................................................................... 12 3.1 做好施工總圖設計與管理 ...................................................................................................................... 12 3.2 按施工程序施工 ...................................................................................................................................... 12 3.3 場內標語、標志和室外布置 .................................................................................................................. 12 3.4 材料堆場和堆放 ...................................................................................................................................... 13 3.5 場地 .......................................................................................................................................................... 13 3.6 教育 .......................................................................................................................................................... 13 3.7 服飾與標牌 .............................................................................................................................................. 13 3.8 施工現場五牌一圖及圍墻處理 .............................................................................................................. 13 3.9 宿舍 .......................................................................................................................................................... 15 3.10 環境衛生 ................................................................................................................................................ 15

五、消防管理措施 .................................................................................................................................................. 15

六、治安保衛管理措施 .......................................................................................................................................... 16

七、職業健康安全管理 .......................................................................................................................................... 16

八、做好社區服務工作 .......................................................................................................................................... 17

1 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

一、工程概況:

工程名稱:貴州省六枝特區示范小城鎮生態環境二期建設工程--(落別鄉外立面改造) 工程工程地點:貴州省六枝特區落別鄉

工程簡介:本工程主要是對原有民用住宅外墻立面進行裝飾改造,住房多為農戶自建房,房屋結構形式為1層至4層磚混結構,普遍為三層。因此外觀不統一,影響了落別鄉的整體風貌,通過對外墻立面進行裝飾改造,改變原有村容村貌不規整、不統一的外觀,使落別鄉整體風貌得到美化提升,營造了一個舒適、美麗的家園。

施工內容:

1、外墻面裝飾工程:包含外墻磚/石墻面抹灰、外墻面抗裂砂漿找平、外墻面滿刮防水膩子、外墻面刷白色乳膠漆飾面、外墻真石漆飾面、裝飾圖案等;

2、屋面工程:包含舊屋面瓦拆除及新瓦鋪裝、圍水圈或女兒墻砌磚蓋瓦、圍水圈防水、屋頂圍水圈閉水試驗等;

3、外墻面防腐木裝飾工程:包含外貼窗框木制裝飾線條、外墻木制裝飾腰線、外墻角木制裝飾線條、垂柱、掛落、包方柱、墻面木制飾面、中式木制仿古門(窗)花、陽臺木制仿古欄桿格柵(含現澆混凝土壓頂);

4、街面商鋪廣告招牌;

5、室內廚房、衛生間、排水管道、化糞池等。

工程難點及特點:本工程屬于農村老舊民用住房綜合改造項目,所施工工程居民不撤離施工場地,因此施工期間安全隱患非常大,個別居民很不積極配合施工,其次工產生的噪音肯定給居民帶來影響,所以為了盡量避免影響居民,施工作業時間大大縮短,施工時間控制在早8點至12點,下午2點至6點,其余時間禁止施工,因此施工時間短,窩工時間較長。

二、編制依據

《建筑施工安全檢查評分標準》(JGJ59-99) 《建筑施工扣件式鋼管腳手架安全技術規范》(JGJ130-2001/J84-2001) 《建筑施工高處作業安全技術規范》(JGJ80-91) 《施工現場臨時用電安全技術規范》(JGJ46-2005) 《建筑機械使用安全技術規程》(JGJ33-2001/J119-2001) 《建設工程施工現場供用電安全規范》(GB50194-93) 《建筑施工現場環境與衛生標準》(JGJ146-2004) 《建設工程施工現場安全防護、場容衛生、環境保護及保衛消防標準》(DBJ01-83-2003)

2 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

三、安全生產保證措施

3.1 建立安全生產組織機構

項目經理為安全生產第一責任人,各級生產管理人員,按照“一崗雙責"的原則,落實各自的安全生產責任制。成立以項目經理郭紅生為主管,專職安全員張小強為具體負責,施工負責人鄭重具體落實的安全保證體系,確保在本工程施工進程中不出安全事故。

3.2 安全管理制度

①建立安全崗位責任制度:各級管理人員,以及勞務班組工人,均應簽定相應崗位安全生產責任書,明確各自職責,自覺遵守安全生產管理制度,不違章指揮和違章作業。公司與項目經理簽定安全生產責任書,項目部將安全生產責任書層層分解,施工員、安全員、技術員、材料員、機械員以及各工種勞務作業人員,均按一崗雙責的原則,明確自己崗位職責,隨時把安全生產放在第一位。

②安全教育培訓制度:參加施工的作業人員,必須先進行三級安全教育培訓和考試,合格后方準進場作業。

③安全方案審批制度:施工作業前,必須編制專項安全施工方案,比如腳手架施工、安全用電等專項施工方案,經公司技術負責人審批后執行。

④安全技術交底制度:根據批準的施工方案,嚴格執行班前安全教育和安全技術交底制度,針對各工種作業條件、天氣條件、施工進度等進行針對性的安全技術交底,進行本工種作業危險源的識別和必須的安全防護及應急預案演練工作,并履行交底和被交底人的簽字手續。

⑤建立安全操作規程:針對各工種作業,編制安全操作規程,安全操作規程粘貼上墻。各工種工人施工作業時嚴格按操作規程作業,杜絕違章指揮和違章作業現象發生。

⑥特種作業持證上崗制度:嚴格按照國家有關安全生產的規定,特種作業人員必須持證上崗。

⑦定期安全檢查制度:建立定期安全檢查制度,每月至少一次對施工現場安全生產情況進行拉網式安全隱患排查工作,按照《JGJ59-2011》要求,對施工現場安全施工情況進行綜合評定,對發現的安全隱患,按照“三定”的原則,定時間、定整改措施和整改責任人、定檢查驗收,將安全隱患消除在萌芽狀態。

3 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

3.3安全管理

3.3.2、鋼筋工程安全施工措施

(1)在高處、深坑綁扎鋼筋和安裝鋼筋骨架,必須搭設腳手架或操作平臺,臨邊應搭設防護欄桿。

(2)綁扎立柱和墻體鋼筋時,不得站在鋼筋骨架上或攀登骨架上下。

(3)綁扎圈梁、挑梁、挑檐、外墻和邊柱等鋼筋時,應站在腳手架或操作平臺上作業。無腳手架時必須搭設水平安全網。

(4)綁扎和安裝鋼筋,不得將工具、箍筋或短鋼筋隨意放在腳手架或模板上。

3.3.3、模板工程安全施工措施

(1)地面上的支模場地必須平整夯實,并同時排除現場的不安全因素。 (2)模板工程作業高度在2m以上時,必須設置安全防護設施。

(3)操作人員登高必須走人行梯道,嚴禁利用模板支撐攀登上下,不得在墻頂、獨立梁及其他高處狹窄而無防護的模板上行走。

(4)模板的立柱頂撐必須設牢固的拉桿,不得與門窗等不牢靠和臨時物件相連接。模板安裝過程中,不得間歇,柱頭、搭頭、立柱頂撐、拉桿等必須安裝牢固成整體后,作業人員才允許離開。

(5)拆模作業時,必須設警戒區,嚴禁下方有人進入。拆模人員必須站在平穩牢固可靠的地方,保持自身平衡,不得猛撬,以防失穩墜落。

(6)拆除的模板支撐等材料,必須邊拆、邊清、邊運、邊碼垛。

(7)拆除順序:先支后拆,后支先拆,先拆非承重模板,后拆承重模板。 (8)拆除跨度較大的梁底模時,從跨中開始分別拆向兩端。

(9)拆模時不要用力過猛,拆下的木模要及時運走清理干凈,按規格分類堆放整齊。

3.3.4、混凝土工程安全施工措施

(1)澆筑混凝土使用的溜槽節間必須連接牢靠,操作部位應設護身欄桿。

(2)混凝土振搗器使用前必須經電工檢驗確認合格后方可使用。開關箱內必須裝設漏電保護器,插座插頭應完好無損,電源線不得破皮漏電;操作者必須穿絕緣鞋,戴絕緣手套。

3.3.5、腳手架工程安全施工措施

(1)腳手架要編制專項安全施工方案和安全技術措施交底。

(2)正確使用個人安全防護用品,必須著裝靈便,在高處作業時,必須佩戴安全帶與已

4 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

搭好的立、橫桿掛牢,穿防滑鞋。

(3)風力6級以上強風和高溫、大雨、大霧等惡劣天氣,應停止高處露天作業。風、雨過后要進行檢查,發現傾斜下沉、松扣、崩扣要及時修復,合格后方可使用。

(4)腳手架要結合工程進度搭設,搭設未完的腳手架,在離開作業崗位時,不得留有未固定構件和不安全隱患,確保架子穩定。

(5)在帶電設備附近搭、拆腳手架時,應停電作業。

(6)腳手架搭設、拆除、維修和升降必須由架子工負責,非架子工不準從事腳手架操作。 (7)腳手架搭設的基本要求:橫平豎直,整齊清晰,圖形一致,結構牢固,有安全操作空間,不變形,不搖晃。立桿接頭交錯布置,將其對接接頭錯開,位于不同高度上,使立柱受荷載的薄弱截面錯開。

在腳手架的轉角,端頭及沿縱向每隔12m處設十字撐。從底到頂連續布置。斜撐采用單鋼管,鋼管與地面呈450—600。

(8)立柱接桿、扶手接長應用對接扣件,不宜采用旋轉扣件。大、小橫桿與立柱連接,扶手與立柱連接采用直角扣件。剪刀撐和斜撐與立桿和大橫桿的連接應采用旋轉扣件。剪刀撐的縱向接長應采用旋轉扣件,不宜采用對接扣件,所有扣件開口必須向外,防止閉口縫的螺栓鉤掛操作者的衣褲,影響操作和造成事故。

(9)在搭設腳手架時,每完成一步都要及時校正立柱的垂直度和大、小橫桿的水平度,使腳手架的步距、橫距、縱距上下始終保持一致。 其搭設進度一般應高于施工面一步,使在操作面上的施工人員有可靠的安全圍護。

(10)建筑物出入口處設置安全隔離防護,在出入口處的外側設雙層防護棚以保護人員出入安全,同時懸掛明顯安全標識和警示牌。

3.3.6、 安全防護用器具

現場使用安全帽、安全網、安全帶等安全防護用品和用具,均按照國家安全管理相關規定進行購置,并進行試驗合格后入庫發放,杜絕“三無”產品流入施工現場,建立安全用品發放臺賬。

3.3.7、施工現場臨電安全措施

(1)現場施工用電纜、電線必須采用TN-S三相五線制。嚴禁使用三相四芯再外加一芯代替五芯電纜、電線?,F場所有配電導線采用橡套軟電線,不準使用塑料線及花線,不允許用鐵絲、銅線代替保險絲。

(2)施工用電投入運行前,要經過安全管理部及總承包項目技術負責人驗收合格后方可

5 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

使用,管理人員對現場施工用電要有技術交底。

(3)臨時用電線路采用架空敷設,潮濕和易觸及帶電體場所的臨時照明采用不大于24V的安全電壓。

(4)施工現場供電線路、電氣設備的安裝、維修保養及拆除工作,必須由持有效證件的電工進行。

(5)配電房室內安全工具及防護措施、滅火器材必須齊全有效。

(6)對易燃易爆、危險品存放場所的設備,要加強監控、檢查工作,發現問題立即整改。 (7)對固定、移動機具及照明的使用應實行二級漏電保護。并經常進行檢查、維修和保養。

(8)現場電工必須熟練掌握并認真執行建設部施工現場臨時用電安全技術規范,及供電局、勞動局安全技術須知有關規定。

(9)電工持證上崗,堅守工作崗位,遵守職業道德和操作規程,并做好施工日志。面向生產第一線,做到隨叫隨到,對工作認真負責,不斷提高技術水平,全心全意為施工生產服務。

(10)現場電工應隨時掌握現場所有供電線路、用電設備的絕緣程度和使用運行情況,設備增減情況,開關箱、流動箱及用電設備的熔絲匹配情況,插座及開關的保護蓋齊全完好情況,如有損壞時應及時更換。

(11)現場使用的配電箱、線路、用電設備、零配件齊全無損,無裸露,標記無脫落,外觀清潔,擺放整齊。

(12)必須嚴格做到“三級配電、二級保護”。施工現場必須設置總配電箱或柜,不得直接在供電局或建設單位提供的電源系統上向各分配電箱供電。

(13)各類配電箱中的RC熔斷器內嚴禁使用銅絲作保護,必須使用專用的銅熔片,并做到與實際使用相匹配。

(14)開關箱必須做到“一機、一閘、一漏、一箱”的要求,箱內漏電開關不得大于30mA/0.1s的額定漏電動作電流要求。

(15)開關箱必須固定掛設,不得隨地放置,嚴禁箱體傾斜15°以上使用。

(16)對所有供電線路、用電設備、各類配電箱,現場值班電工班每天至少要進行兩次全面細致的的檢查,發現問題及時處理并做好記錄。

(17)值班人員按規范要求定期對配電室低壓柜進行檢查清掃,發現問題及時匯報。 (18)對施工現場所有配電箱,每周必須清掃一次?;覊m多、潮濕等場所,根據情況增加

6 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

清掃次數,保證配電箱的清潔完整。

(19)用電設備在安裝使用前,必須先搖測絕緣電阻,合格后才能投入使用。

(20)現場電工必須做好漏電保護開關的動作記錄,如動作時間、動作原因、動作次數等,查清動作原因處理恢復后,才能繼續投入使用。

(21)現場所有用電設備 必須另接三級配電箱,否則不準使用。箱內必須配有開關及漏電保護器,三級箱與二級箱距離不得大于30m,三級箱至用電設備距離不得大于5m。

(22)在雨季施工每月必須對漏電開關進行末端試驗,發現不動作立即更換,如實記錄。

3.3.8、易燃、易爆、有毒、化學品使用安全措施

(1)單獨庫存,有明顯標識,且遠離辦公區、生活區及木工房。所有材料均要將品種、數量記錄詳細;

(2)有毒物的施工,應保持通風;

(3)施工現場應有滅火器材(如滅火器、消防砂池等); (4)剩余材料及時回收,單獨存放、銷毀。

(5)施工材料的存放、保管,應符合防火安全要求,庫房應用非燃材料搭設,易燃易爆物品應專庫儲存,分類單獨儲存,保持通風,用電符合防火規定,化學類易燃品和壓縮可燃氣體容器等,應按照其性質設置專用庫房分類存放,其庫房的耐火等級應符合公安部制定的《倉庫防火安全管理規則》,使用后的廢棄物料應及時消除。

(6)使用易燃易爆物品,必須嚴格防火措施,指定防火負責人,配備消防器材,確保施工安全。

3.3.9、其它設備及施工機具

1)嚴禁拆除機械設備上的自動控制機械、力矩限位器等安全裝置,及監測、指示、儀表、警報器等自動報警、信號裝置。其調試和故障的排除應由專業人員負責進行。

2)新購或經過大修、改裝和拆卸后重新安裝的機械設備,必須按原廠說明書的要求進行測試和試運轉。

3)處在運行和運轉中的機械嚴禁對其進行維修、保養或調整等作業。

4)機械設備的操作人員必須身體健康,并經過專業培訓考試合格,在取得有關部門頒發的操作證或駕駛執照、特殊工程操作證后,方可獨立操作。學員必須在師傅的指導下進行操作。

5)高空作業必須戴安全帶。嚴禁從高處往下投擲物件。

6)現場施工負責人應為機械作業提供道路、水電、臨時機棚或停機場地等必須的條件,

7 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

并消除對機械作業有妨礙或不安全的因素。夜間作業必須設置有充足的照明。

7)在有礙機械安全和人身健康場所作業時,機械設備應采取相應的安全措施。操作人必須配備適用的安全防護用品。

8)變配電所等相應場所應按消防規定的要求設置各種防火消防器材及工具,其周圍不得堆放物品。

9)電氣設備每個接地點應以單獨的接地線與接地干線相連接。嚴禁在一個接地線中串接幾個接地點。

10)在低壓線路裝置中,嚴禁利用大地作零線供電。不得借用機械本身金屬結構作工作零線。

11)嚴禁帶電作業或采用預約停送電時間的方式進行電氣檢修。檢修電氣設備前必須切斷電源開關,上掛“禁止合閘有人工作”的警牌。警告牌的掛、取應有專人負責。

12)發生人身觸電時,應立即切斷電源,然后對觸電者作緊急救護。 嚴禁在未切斷電源之前與觸電者接觸。

13)移動式機械的電源導線(或臨時電源)必須采用絕緣良好的橡皮套銅芯軟電纜(俗稱橡皮軟線)其中必須有一根專用的接地(接零)線。電源導線不得直接綁扎在金屬架上。

14)電動鑿巖機電纜線不得敷設在水中或在金屬管道上通過,施工現場要設標志,嚴禁機械、車輛等在電纜上通過。

15)潛水泵放入水中,或提出水面,應先切斷電源,嚴禁拉拽電纜或出水管

16)混凝土振搗器作業轉移時,電動機的導線應保持有足夠的長度和松度。嚴禁用電源線拖拉振搗器。

17)混凝土振搗器操作人員必須空戴絕緣膠鞋和絕緣手套。

18)鋼筋冷拉機冷拉場地在兩端地錨外側設置警戒區,裝設防護欄桿及警告標志。嚴禁無關人員在此停留。操作人員在作業時必須離開鋼筋至少2m 以外。

19)電動吊籃在利用吊籃進行電焊作業時,必須對吊藍、鋼絲繩進行全面防護,不得用其作為接線回路。

20)升降平臺嚴禁超載使用,載人作業時平臺四周應有護欄并插上鎖銷。

21)木工機械工作場所應備有齊全可靠的消防器材。嚴禁在工作場所吸煙和有其他明火,并不得存放油、棉紗等易燃品。

22)卷板機被刨木料的厚度小于30mm,長度小于400mm時,應用壓板或棍推進。厚度在15mm,長度在250mm以下的木料,不得在平刨上加工。

8 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

23)電弧焊焊接時,焊接和配合人員必須采取防止觸電、高空墜落和火災等事故的安全措施。

24)高空焊接或切割時,必須掛好安全帶,焊件周圍和下方應采取 防火措施并有專人監護。

25)電焊線通過道路時,必須架高或穿入防護管內埋設地下。

26)電弧焊接地線及手把線都不得搭在易燃、易爆和帶有熱源的物品上,接地線不得接在管道、建筑物金屬構架上,接地電阻不大于1歐姆。

27)電弧焊施焊現場的10m范圍內,不得堆放氧氣瓶、乙炔瓶及木材等易燃易暴物。 28)氣焊嚴禁使用未安裝減壓器的氧氣瓶進行作業。

3.3.10 消防管理

①配備必要的消防設施,消防設施定期進行檢查,特別是滅火器材,嚴禁使用過期報廢用品;定期進行消防演練和消防培訓工作。

②動火負責人(施工負責人)、施工員必須認真檢查“動火證”填寫內容是否符合動火現場的實際情況,發現“動火證”內容有不完整的方面,必須及時向“動火”簽發部門提出,嚴禁盲目施工。

③在非禁火區或固定動火區內動火,應按建設單位的動火規定進行。在易燃、易爆的樓房、管道、設備和禁火區危險場所動火作業,必須按甲方的規定,先申請辦理“動火證”,同時,由甲方有關人員進行氣體分析合格下同意并派動火監護人到場監護后,方準動火。否則,禁止動火作業。

④在危險場所高處焊割作業,要采取防止火花飛濺的措施,遇有六級以上(含六級)大風時,應停止作業。

⑤對動火點的易燃物品,在動火(焊割)前應清理干凈。 ⑥對沾有易燃、可燃的材料、設備,動火(焊割)前應沖洗干凈。

⑦動火作業必須嚴格按照“動火”所規定的時間進行,不準延長作業時間,延長作業時間必須另辦手續。

⑧“動火證”要妥善保管,不準隨意涂改、轉讓或轉移動火地點。

⑨動火地點應有滅火器材、監護人員,動火完畢,待火種熄滅并檢查確認后,方可離開現場。

3.3.

11、 冬、雨季施工

①遇有六級以上(含六級)大風時,禁止吊裝作業和高處作業。

9 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

②施工現場以及存放易燃、易爆物品的設施內,嚴禁烤火或使用電爐,防止火災事故的發生。

③雨天作業,與現場焊接要設有防雨防風設施。

3.3.

12、個人防護

進入施工現場所有人員戴好安全帽,凡從事2m以上,無法采取可靠防護設施,高處作業的人員系好安全帶,從事電氣焊、剔鑿等作業的人員要使用面罩或護目鏡,特種人員持證上崗,并佩帶相應的勞動保護用品。

3.3.

13、腳手架安全施工技術措施

(1)材質及其使用的安全技術措施

1)扣件的緊固程度應在40~50N.m,并不大于65 N.m對接扣件的抗拉承載力為3KN??奂下菟ū3诌m當的擰緊程度。對接扣件安裝時其開口應向內,以防進雨,直角扣件安裝時開口不得向下,以保證安全。

2)各桿件端頭伸出扣件蓋板邊緣的長度不應小于100mm。

3)鋼管有嚴重銹蝕、壓扁或裂紋的不得使用。禁止使用有脆裂、變形、滑絲等現象的扣件。

4)外腳手架嚴禁鋼竹、鋼木混搭,禁止扣件、繩索、鋼絲、竹篦、塑料混用。 (2)腳手架搭設的安全技術措施

1)搭設過程中劃出工作標志區,禁止行人進入、統一指揮、上下呼應、動作協調,嚴禁在無人指揮下作業。當解開與另一人有關的扣件時必先告訴對方,并得到允許,以防墜落傷人。

2)開始搭設立桿時,應每隔6跨設置一根拋撐,直至連墻件安裝穩定后,方可根據情況拆除。

3)腳手架及時與結構拉結或采用臨時支撐,以保證搭設過程安全,未完成腳手架在每日收工前,一定要確保架子穩定。

4)在搭設過程中應有安全員、架子班長等進行檢查,驗收和簽證。 (3)腳手架上施工作業的安全技術措施

1)當作業層高出其下連墻件3.6m以上、且其上尚無連墻件時,應采取適當的臨時撐拉措施。

2)各作業層之間設置可靠的防護柵欄,防止墜落物體傷人。

3)定期檢查腳手架,發現問題和隱患,在施工作業前及時維修加固,以達到堅固穩定,

10 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

確保施工安全。

(4)腳手架拆除的安全技術措施

1)拆架前,全面檢查擬拆腳手架,根據檢查結果,擬訂出作業計劃,報請批準,進行技術交底后才準工作。

2)架體拆除前,必須察看施工現場環境,包括空線路、外腳手架、地面的設施等各類障礙物、地錨、纜風繩、連墻件及被拆架體各吊點、附件、電氣裝置情況,凡能提前拆除的盡量拆除掉。

3)拆架時應劃分作業區,周圍設繩綁圍欄或豎立警示標志,地面應設專人指揮,禁止非作業人員進入。

4)拆除時要統一指揮,上下呼應,動作協調,當解開與另一人有關的結扣時,應先通知對方,以防墜落。

5)在拆架時,不得中途換人,如必須換人時,應將拆除情況交代清楚后方可離開。 6)當天拆架下班時,不應留下隱患部位。

7)拆架時嚴禁碰撞腳手架附近電源線,以防觸電事故。

8)所有桿件和扣件在拆除時應分離,不準在桿件上附著扣件或兩桿連著送到地面。 9)所有的腳手板 ,應自外向里豎立搬運,以防腳手板和垃圾物從高處墜落傷人。 10)拆下的零配件要裝入容器內,用垂直運輸工具吊下。

3.3.

14、腳手架的安全、防風防雷措施

1.外腳手架消防措施

外腳手架平橋上禁止堆放碎板、碎紙、水泥袋等雜物。 嚴禁在外腳手架上亂丟火種。

外腳手架消防列工地施工現場消防體系,在各樓層設置足夠的滅火器材。

施工現場臨時使用的電線、電閘不得掛在外腳手架上,確實施工需要時,必須用有效的絕緣材料進行安裝。

在外腳手架內的電器設備必須有防雨、防漏電措施。嚴禁隨意將碘鎢燈安裝在外腳手架上。

外腳手架內的用電設備,必須經常派專人專職進行檢查,發現問題及時整改處理。 2.腳手架的防風、防雷措施

在腳手架最高處設避雷針,通過引下線至接地極,接地電阻不得大于4歐姆。 在高壓線路下方均不得搭設腳手架,腳手架的外側邊緣與外電架空線路的邊線之間必須

11 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

保持安全操作距離。

房屋四角腳手架立桿上設避雷針,并將所有最上層大橫桿全部接通,形成避雷網,接地線采用直徑不小于8mm的圓鋼,應保證接觸可靠,接地板用直徑不小于20mm的圓鋼,按腳手架不超過50m設置一個,埋入地面于深度不淺于500mm。在施工期間遇有雷雨時,鋼腳手架上作人員立即離開。

四、文明施工管理措施

文明施工是施工企業精神文明建設的重要內容,是加快工程進度,提高工程質量,保證安全施工的重要措施,因此還須做好以下幾方面:

4.1 做好施工總圖設計與管理

①項目經理部負責施工總圖的設計與管理工作。

②施工總圖的設計要布局合理,各種臨時工程設施的座標與正式工程核對,并經工程總圖批準。

③臨設工程必須按施工總圖布局施工,如需要更改必須經施工總圖設計批準。

3.2 按施工程序施工

①按設計、規范、規程、標準、施工方案、技術措施施工。 ②上下工序要進行交接,組織檢查,辦理手續。

③多工種交叉作業,要以利于施工為原則,組織綜合平衡,做到交叉有序,忙而不亂。 ④因施工需要清除障礙物,破斷道、停電、停水,動力線路必須辦理申請批準手續。

3.3 場內標語、標志和室外布置

①工地內顯著部位,腳手架和井架等處懸掛工作方針要求的白底蘭字標語及安全生產宣傳牌。

②工地所有人員佩戴由公司統一制作的胸卡上崗。 ③安全總值班佩戴袖章標志上崗。

④現場管理人員和各類操作人員戴規定顏色的安全帽。

⑤在主要施工部位、作業點、危險區,主要道口必須掛有安全宣傳標語或安全警示牌,樓層主要道口必須懸掛樓層標記。

⑥現場辦公室應懸掛科室標牌,室內張貼衛生值日牌,物品實行定置管理。室外設水斗

12 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

和下水管。

⑦會議室保持整潔,墻上張掛工程方針目標圖、組織機構圖、質量保證體系圖、安全保證體系圖、形象進度表、氣象記錄圖表。

⑧固定設置立桿必須油漆,通道立桿紅白漆相間。

3.4 材料堆場和堆放

①堆場要平整,按場地布置圖分類堆放。堆場一律設分隔標志,線內堆物。多余的材料與物品要及時退場,無散亂物件。上料架和堆料地的搭設應規范化,做到整齊劃一。

②鋼管分規格、分層次一頭齊,掛牌堆放。零件分規格入庫必須搭棚。 ③周圍設備分規格堆放,封閉式管理。 ④特殊材料設庫堆放,封閉式管理。

3.5 場地

對施工場地詳細規劃,將施工作業區與生活分開,對生產區進行有效的管理,統一生活垃圾、廁所、浴室派專人負責清掃,并實施定期檢查。

3.6教育

現場施工作業人員必須由其所在班組長負責進行文明施工的思想教育,提高職工創安全生產標準化和文明施工標準化的思想覺悟和意識,做到文明施工、文明操作,互相團結,互相幫助,發揚風格。突出標準化、文明施工宣傳氣氛,掛設統一標牌,設置宣傳欄,使每一個人員樹立“文明施工標化管理在我心”的思想意識,從而自覺地付諸于實踐的施工操作中。

3.7 服飾與標牌

本工程管理人員和操作人員都將掛牌上崗作業,操作工人采用統一的安全帽,要求服飾整齊,嚴禁穿拖鞋、裙子上班。

3.8 施工現場五牌一圖及圍墻處理

五牌一圖用不干膠制作,藍底白字,標題用黃色較大字,所有標題左側標有公司企徽;牌的大小必須與工地規模大小相稱。

(1)工程概況牌

包含以下內容:工程名稱、建設單位、設計單位、施工總承包單位、安裝分包單位、質量監督單位、安全監督單位、監理單位、項目負責人、結構及層數、面積、建筑高度、合同造價、計劃開工日期、計劃竣工日期

13 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

(2)管理人員名單及監督電話牌

指項目部管理班子及主要班組,畫一張示圖,要明確崗位、姓名、彩照上墻。 (3)消防保衛牌

①自覺遵守國家法律和企業、項目有關規章制度,嚴禁酗酒鬧事、賭博、偷竊、斗毆、搞流氓活動,不得攜帶匕首等其他兇器。

②自覺接受項目保衛人員的查問和有關證件檢查。 ③班組必須有專(兼)治安消防負責人。

④作業人員必須按規定向所在公安部門領取暫住證,嚴禁擅自留宿外來人員,婦女無計生證的,不得滯留在工地。

⑤現場明火作業時,必須先報項目保衛消防辦公室審批后方準動,并實行誰動火、誰申請、誰負責的原則,不得擅自動用明火,作業現場必須設專人監護,作業完畢經確認安全后方準離開。

⑥施工現場嚴禁吸煙。易燃易爆物品場和木工車間嚴禁吸煙的明火作業。 ⑦宿舍嚴禁使用熱得快、電爐等炊具,嚴禁亂拉接電線。 (4)文明施工牌

①做到作業標化、環境衛生美化、健康標準化、場地凈化和市區主要道路夜間亮化。 ②按規定設置五牌一圖和其他安全標志牌。

③工地各班組做到工完場清,工完料盡,垃圾廢料及時清理。

④施工地各班組做到封閉式管理,施工作業時應采取降低噪聲措施,凈車出場,做到施工不擾民,作好工居共建工作。

⑤材料歸類整齊堆放,不混放,設標示牌。

⑥落實工地治安消防負責制,配備必要的消防設施,把好動火審批監護關。

⑦“五小設施”必須保持衛生整潔,管理制度和責任人上墻。食堂應有衛衛生許可證,炊事員持健康證崗;廁所內外刷白,設高位水箱;民工宿舍定人、定床、定位,嚴禁男女混住。

⑧建筑工地作業人員必須登記入冊,三證齊全。 ⑨現場人員安全帽分色佩帶,配胸卡上崗。 (5)安全生產牌

①杜絕重大傷亡事故發生,杜絕機械、火災、治安和場內交通等惡性事件發生,減少一般事故的發生。

14 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

②月工傷事故頻率和歇工率控制在千分之二以內。 (6)施工現場平面圖

根據施工現場實際情況如實制作,另要隨施工進度逐步調整。

3.9 宿舍

①因施工條件與環境的原因,本工程所有員工宿舍均為租用當地居民房屋作為員工臨時宿舍,宿舍內一律用鐵床或統一搭設床鋪。一人一鋪,全部采用低壓電照明,嚴禁員工私拉亂接電路及用電取暖做飯等,且對員工入住前做好相關文明入住教育,做到不擾亂當地居民的正常生活。

②宿舍懸掛衛生、防火制度牌。周圍設置加蓋的垃圾箱殘桶,安裝水斗和下水管,公共場所有專人負責日常清掃保潔。配備好足夠的滅火器材。

③定期組織檢查、評比,開展競賽獎懲活動。

3.10 環境衛生

①工地現場無大面積積水,道路暢通,經常保持清潔。生活區、辦公室周圍放置一定數量的有蓋垃圾桶,并做到每天及時清理。

②建筑垃圾應堆置在規定地點,生活垃圾應由專用容器存放,并及時清運,要落實各項除害措施,嚴格控制“四害”孳生。

③工地應設醫務室,或巡回醫療點,醫務人員要明確責任制,做好防病和衛生管理工作。

五、消防管理措施

4.1 項目經理是工地防火第一負責人,應層層落實防火責任制,并設專職或兼職消防員,行使對施工人員的防火監督職能。建立防火檔案和不小于職工總數10%的義務消防隊,要有教育培訓計劃每月不少一次演練管理制度,每月經常開展活動,并有記錄。

4.2 按施工區域層次劃分動火級別,落實持證上崗,動火審批制度,動火審批人必須實地查看現場,并提出防范要求才能簽發動火證,電梯井、管籠等處動火必須有明火監控管理,做好專職防火監護員監護工作和防止火星下落的措施。

4.3 嚴格執行危險品押運制度,易燃物品必須在運離木庫、竹庫等30m 以外的通風、陰涼處不燃材料搭設專用倉庫。氧氣和乙炔倉庫分別設置,間距大于5m,危險品庫外設禁火標志和制度牌。管理員應持證上崗,一般配備2~5 只3~5 公斤的二氧化碳滅火器。氧氣瓶不得碰油脂,乙炔瓶豎立使用;氧氣瓶、乙炔瓶的存放間距大于5m,防火防爆裝置等完好,氣

15 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

管接口用專用類具,夏季露天使用時應有遮擋。

4.4 配電間應用不燃或阻燃材料搭設,懸掛禁火標志和防火制度牌,以每50平方米建筑面積不少于4 只的數量配備3 公斤干粉滅火機和落實消防水栓。

4.5 嚴格易燃、易爆物品使用制度,隨領隨用,做好落實手清工作。易燃物品應及時清出樓層,集中歸堆,落實防火制度。

4.6 配電間及其他集中用電器處,配二氧化碳滅火機。

4.7 施工現場嚴格控制使用電加熱器,如情況特殊須使用,必須按規定辦理審批登記手續。經批準允許使用的電加熱炊具,應集中在指定的安全地點使用,架設專用電線,落實防火安全措施,并指定專人負責管理。

六、治安保衛管理措施

5.1 設置治安保衛管理員一名,專門負責治安保衛工作,并建立現場治安管理小組。認真落實施工現場的防火、防盜、防破壞及治安管理等安全措施。嚴禁賭博、偷盜、打架斗毆等擾亂正常生產秩序的行為,嚴格執行施工現場的治安保衛工作制度,經常開展以“四防”為內容的安全檢查,消除隱患。

5.2 加強各類物質的管理,施工現場使用的工具、油料、儀器+ 設備、電焊(纜)軟線等物質要嚴格管理,落實專人保管,防止被盜,對操作工人先進行三級安全教育培訓,后上崗的原則,對外來勞務人員,必須堅持三證齊全。方可辦理相關手續。

5.3 嚴格按照國家公安部及地方公安部門的通知執行,切實作好現場治安保衛工作,保證工程正常施工。

七、職業健康安全管理

1.環境管理目標

施工噪音符合環保法的要求,減少施工揚塵,控制廢污染排放,周邊居民投訴率在5%內,杜絕新聞暴光,杜絕重大環境污染事故。

2.職業健康安全管理目標:

按規定配備勞保用品,預防和減少職業病的發生,杜絕重大傷亡事故、重大火災事故、重大設備事故,月工傷事故頻率和歇工率控制在2‰以下。

16 貴州省六枝特區示范小城鎮生態環境(二期)建設工程--(落別鄉外立面改造)

【安全文明施工專項方案】

3.環境因素管理措施:

根據公司程序文件、重大環境因素清單,識別本項目的重大環境因素,分析本工程所處區域、環境、工程特點,進行環境因素的識別、評析、編制優先重大環境因素管理方案,并根據管理方案有效實施。

(1).利用聲級儀檢測不同階段等效聲級,主體階段白天不得大于70分貝,夜間不得大于55 分貝,裝飾階段白天不得大于65 分貝,夜間不得大于55 分貝。

(2).水泥桶用密目網圍護,清掃垃圾,拆架時用水淋濕,避免揚塵。 4.危險源的控制措施:

(1)項目部在項目策劃時,把公司已確定為重大危險源,在項目存在的,相應采取運行控制、管理方案與應急預案,并且根據本項目的地理位置、環境特點和相關方要求,補充識別特定的危險源,評價后納入統一的控制方案中。

(2)項目經理部若有新增危險源,則報工程部送公司工程管理部,以便更新危險源清單。 5.職業健康與安全具體措施:

(1)加強對職業病防治知識的宣傳教育,使員工能做好自身保護。 (2)加強勞保用品的發放與使用監督,并著重做好以下幾點: a.電工配備絕緣電工靴。

b.砼工配備雨靴,振搗手配備耳塞、橡皮手套,攪拌工配備防塵手套。 c.架子工配備安全帶。

d.電焊工配備面罩、絕緣手套、絕緣膠鞋。

針對建筑業員工多發職業病。如塵肺、職業中毒、職業性兒病、職業性腿病、心血管疾病、骨髓及軟組織損傷、高溫中暑、對電焊工、粉塵作業人員、油漆工等特殊工種,定期組織健康檢查。

八、做好社區服務工作

工地有專人負責協調與周圍居民、所在地居委會、市政交通、環衛等單位的橫向關系,定期召開會議,聽取他們對工程建設的有關意見,保證工程文明施工,使工程成為愛民工程、便民工程。